Start with the business problem, not a feature list. Who will use the system, how many times a day, and how is the job done today? A vendor who grasps the purpose often proposes a simpler way to reach it; one who only sees the requirements as given prices your assumptions along with the work.
Set out the scope as concrete flows: who does what, and what happens next. Equally important, list what you are not building. An explicit list of exclusions removes more disagreement at delivery time than any other single page. Indicate as well which parts are firm and which are still open — honest dedicated teams vs project-based outsourcing price those differently, and hiding it only hurts you.
Write down the hard constraints. These include existing systems the software has to talk to, the data you already hold and its condition, compliance requirements, user volumes, which devices matter and infrastructure that is already decided. If there is a hard date, explain what drives it: a good team can often cut the right scope to meet it, provided they hear about it early.
Write down what done means feature by feature. Acceptance criteria do not require formal language: a short list describing what must be true when the feature works will do. That one addition shortens acceptance testing by a surprising margin and eliminates most late-stage disagreement.
To close, ask for a specific format. Ask for laravel vs symfony comparison an itemised estimate, a written list of assumptions, the risks the team sees and a low number and a high number. Read a wide range as useful information rather than evasion: it normally identifies the part of the brief that needs work. From there clarify that area and ask again — the next version will be much more reliable.