The dominant factor is not the choice of swift web framework — it is almost always uncertainty. Each unanswered question in the specification becomes padding inside the number you receive. A supplier that cannot see the edge cases has to assume the more expensive option. Putting two weeks into requirements work frequently cuts the overall figure far more than any rate negotiation.
Integrations tend to be the second big multiplier. A feature that touches only your own data is low risk; the same functionality connected to a legacy ERP is a different problem. The cost lives in the counterparty: rate limits and sandbox access, waiting on someone else's team, fields that mean something different on each side. Ask any vendor to list every external system, because that is where the numbers slip.
Quality attributes quietly rewrite the estimate. A tool used by a handful of staff is a very different build from the same functionality handling a hundred thousand users. Compliance work, availability guarantees, performance under load, traceability and localisation all add real engineering time. State them early or else expect them to arrive later as change requests.
The mix of people behind the number changes the arithmetic. A day rate reveals almost nothing on its own: one senior developer at a higher rate frequently turns out to be less expensive in the end than two juniors who need heavy code review. Also ask which roles are billed: coordination, testing, infrastructure work and UX design are legitimate costs, but they should be itemised.
The quoted figure is not the full cost of ownership. Budget for cloud costs, third-party licences, logging and alerting and an ongoing support budget annually. A common working assumption is that a live system consumes a meaningful share of its original build cost annually in fixes, updates and azure development company small changes. Treating the launch as the finish line remains the most frequent planning error.